Day43 | Putting on bottom plate |
The marked pieces were taken down for cutting and grinding. Amazingly, once put back up into place they fit quite well. We found that the notorious radius plate, just after the first join, had bulged out some. |
Holes cut for welding pass |
Once corrected
with the jack, and some grinding to take out the overlap,
it came in ok. I cut out the rest of the circles (for access to keel hull join) as the points were no longer needed. Going around the stem pipe join with a batten was the hardest to measure. |
It is going
down at a very acute angle under the plate, and
furthermore is round. I had to estimate where it would be
under the plate. Of course Gena had to grind out more
than I had cut. As you can see in the pic to the right, one plate is longer the the other. The one to the left was moved up so it wouldn't run to close to the edge as the one on the right almost did. |
View from high up - Both plates in |
Day 42:
8.5 hours - Tacked in first 2 bottom plates